Stage
The load-lock exchange manifold — roughed by RP2 via V24 and pumped to high vacuum via the DP manifold via V26 to prepare the load lock before specimen transfer into the column via V5.
Connects
- V21 ↔ Load-Lock
- V24 ↔ RP2 Manifold
- V26 ↔ DP Manifold
- V34 ↔ N2 Vent
Photos